TitleProduct

One Stage Single Screw Plastic Flakes Recycling and Pelletizing Machine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-26 06:11

  • Browse the number:

    221

Send an inquiries

Company Profile

Qingdao Barefoot Construction Material Co., Ltd.

By certification [File Integrity]

Contact:Mr. Wong Laye(Mr.)  

Email:

Telephone:

Phone:

Area:Jiangsu

Address:Jiangsu

Website: http://aceretech.artelholdings.com/

PRODUCT DETAILS

One Stage Single Screw Plastic Flakes Recycling and Pelletizing Machine

1. Brief introduction :

 

This type plastic pellets production system desighed for hard pp hdpe ldpe crushed flakes specially,with features of energy saving ,stable performance , good plasticizing and cleaning and drying effection; 

2. Specification of pp pe pellets production system :

Machinery Size Data of Single screw extruder Throught rate
(Kg/hr)
Diameter of screw(mm) L/D Motor power(Kw)
ASE80 80 32 55 120-160
ASE100 100 32 110 260-350
ASE120 120 32 132 330-420
ASE150 150 32 185 450-560
ASE180 180 32 250 650-800
ASE200 200 32 315 800-1000
 

3. Photo of the plastic pellets production system

 

 

 



 

Process:the bulk maerials or thick flakes after crushed,conveyed into the single screw extruder by screw loader,then,compressing,plasticizing in the extruder and removed the violatile and moisture by the vacuum system,after filtering through the filtration system to pelletize into granules.Depends on different screw diameters of single screw extruders,capacity can cover 100 to 1500kg/h.

4. Advantages of ASE extruder & pelletizing system

1. Good quality : Strict quality control ,good reputation in the market;

2. Service : service of our machine ,service of machine customer have already;

3. Delivery : near shanghai seaport;

After sale service for the plastic pellets production system

1. Technical documents

All labels on PP PE pellets production system and lay-out drawings, Electrical diagram, User Manual, will be in English. We should send all necessary files to the buyer since the third week since project execution. All documents in hard copies should be also shipped with machines together.

2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.

b. We will prepare for visa application for their engineers, who are responsible for guide of pp pe pellets production system installation and testing at the Buyer's factory. 

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

3. Quantity and quality guarantee

 

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the pp pe pellets production system at port of destination. We will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

 

b. Guarantee period and after-sales services: 12months since installation finished in buyer's factory.
During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.

 

c. Long-term service:
We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide

 

Packaging & Delivery

 
Packaging Details: Film and wood as internation sea shippment standard for whole pp pe plastic pellets production system
Delivery Detail: 60 working days before delivery